Powering Up the Library
Completing the Installation
5
To complete the StackLink installation:
•
Power up the multiple library stack
•
Disable unused drive bays
•
Configure the library
•
Test the library robotics
To power up the multiple library stack, press the power switch (or
switches) on the back panel of each library module (see
figure
53).
Power up all the library modules in reasonably quick
Caution:
succession; a long delay in powering up the entire
multiple library stack could interfere with library
initialization.
ATL StackLink™ Installation Instructions
Chapter 5
5
figure 52
and
79
Need help?
Do you have a question about the ATL StackLink and is the answer not in the manual?