Chapter 5 Completing The Installation; Powering Up The Library - Quantum ATL StackLink Installation Instructions Manual

Quantum atl stacklink: install guide
Hide thumbs Also See for ATL StackLink:
Table of Contents

Advertisement

Powering Up the Library

Completing the Installation
5
To complete the StackLink installation:
Power up the multiple library stack
Disable unused drive bays
Configure the library
Test the library robotics
To power up the multiple library stack, press the power switch (or
switches) on the back panel of each library module (see
figure
53).
Power up all the library modules in reasonably quick
Caution:
succession; a long delay in powering up the entire
multiple library stack could interfere with library
initialization.
ATL StackLink™ Installation Instructions
Chapter 5
5
figure 52
and
79

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ATL StackLink and is the answer not in the manual?

Table of Contents