Figure 28 Installing Inserts At The Front Of The Shelves; Figure 29 Installing Inserts At The Rear Of The Shelves - Quantum ATL StackLink Installation Instructions Manual

Quantum atl stacklink: install guide
Hide thumbs Also See for ATL StackLink:
Table of Contents

Advertisement

Figure 28 Installing
Inserts at the Front of
the Shelves
Figure 29 Installing
Inserts at the Rear of
the Shelves
3 Screw three inserts into the rear flange of each rack mount shelf in the
positions shown in
of six holes is at the bottom and the group of four holes is at the top,
the inserts go into holes 1, 5, and 10 (counting from the bottom up,
with 1 being the lowest hole).
Some of the inserts have either no head or a head that has
Note:
a smaller diameter than the thread; these need to be left
protruding by about 1/8 in. (3 mm). The inserts with
heads should be tightened fully.
Group of 6 holes
Group of 4 holes
Group of 4 holes
Group of 6 holes
ATL StackLink™ Installation Instructions
Chapter 2 Installing the Rack Mount Shelves
figure
29. If the shelves are oriented so the group
Installing the Shelves
8
4
1
1
5
10
10
5
1
8
4
1
41

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ATL StackLink and is the answer not in the manual?

Table of Contents