Disposal Of Packaging Material; Prior To Installation - RMG USM GT400 Operating Manual

Ultrasonic flowmeter
Hide thumbs Also See for USM GT400:
Table of Contents

Advertisement

6 Transport and storage
Warnung
Risk of injury during transport
The device may be damaged when lifting and putting down, tipping over or
70
falling down. By disregarding the load bearing capacity of the lifting gear, the
device may fall. There is a risk of severe injuries for persons in the vicinity.
Lift the device only on the intended lifting eyes.
Before lifting, make sure that the load is safely secured.
Never stand under suspended loads.
Observe the weight specifications for the ultrasonic gas meter at hand.
4
Carefully lift the device with a lifting gear until the Euro pallet can be pulled
from underneath the device.
5
Pull the Euro pallet from under the device.
6
Recommendation: store the Euro pallet for the future or for returning to
RMG for service work.
6.1.4

Disposal of packaging material

If the packaging material and the Euro pallet are no longer required, dispose of the
material in an environmentally responsible manner according to the country-spe-
cific standards and guidelines.
6.1.5

Prior to installation

The transport locks must only be removed once the device has been installed in
the system and the device has been transported to the installation location.
Hinweis
Damage to the device from contamination and humidity
If transport locks are removed too early, contamination and humidity
may enter the device. The device could be damaged.
Disassemble the transport locks immediately before installing the device.
Manual USM GT400 · EN10 · May 2021

Advertisement

Table of Contents
loading

Table of Contents