Danger
Service and maintenance tasks or repairs that are not described in the op-
erating manual must not be carried out without prior consultation with the
6
manufacturer.
Changes to the device are not permitted.
The technical specifications must be observed and followed for safe oper-
ation (see chapter 13: Technical specifications).
Performance limits must not be exceeded.
Please only use screws, bolts, nuts and seals or parts with comparable
characteristic values for installing the meter in the pipeline. (see chapter 7
Construction and Planning)
For safe operation, the device must only be used in the scope of the in-
tended use. (see chapter 5.1 Intended use).
1.2.4.2
Dangers during commissioning
Initial commissioning
Note
An acceptance test certificate and corresponding test report must be cre-
ated for the commissioning.
These, the operating manual and the CE Declaration of Conformity must
be stored so that they are always readily available. In the process, the en-
tire documentation, including the conformity declarations and certificates
must be checked for completeness.
As far as possible, all sharp edges on the device have been removed. Nev-
ertheless, personal protective equipment must be used for all work, which
must be provided by the operator.
Manual USM GT400 · EN10 · May 2021
The initial commissioning must only be carried out
by specially trained personnel (training by RMG) or
RMG service personnel.