Preparatory Settings; Commissioning The Bcl 248I On The Profinet-Io; Prepare The Control - Leuze electronic BCL 248i Operating Instructions Manual

Bar code reader
Table of Contents

Advertisement

Fast commissioning
1
PWR/SWIO, M12 connector, 5-pin, A-coded
2
HOST, M12 socket, 4-pin, D-coded
Fig. 3.1:
Electrical connections
NOTICE
The shielding is connected using the M12 connector of the Ethernet cable.
Details on the connectors see chapter 6 "Electrical connection".
3.4

Preparatory settings

Ä Connect the +18 ... 30 V DC supply voltage (typically +24 V DC).
ð The bar code reader starts up.
First, you need to assign its individual device name to the BCL 248i. The PLC must communicate this de-
vice name to the participant during the "device naming". Further information may be found below and in
see chapter 8.3.5 "Step 5 – Set device name – device naming".
3.4.1

Commissioning the BCL 248i on the PROFINET-IO

Ä Complete the necessary steps for commissioning a Siemens-S7 control as described below.
Further information regarding the individual commissioning steps is provided in see chapter 8.3 "Configura-
tion steps for a Siemens Simatic S7 control".
3.4.2

Prepare the control

Ä In the first step, assign an IP address to the IO controller (S7 PLC) and prepare the control for a consis-
tent data transmission.
NOTICE
Ä With the S7 control, make sure that at least Simatic Manager Version 5.4 + Service Pack 5
(V5.4+SP5) is used.
Leuze electronic GmbH + Co. KG
1
2
BCL 248i
1 PWR/SWIO
5
1
2
3
4
2 HOST
2
3
1
4
12

Advertisement

Table of Contents
loading

Table of Contents