Figure 17: Pre-Installed Components On The Top Panel; Figure 18: Pre-Installed Din Rail Bracket On The Back Panel - Allied Telesis AT-IS230-10GP Installation Manual

Industrial ethernet layer 2 switches
Table of Contents

Advertisement

Chapter 2: Begin Installation
60
The Power/Alarm connector and the grounding screw locations are
identified in Figure 17.
1
2
Figure 17. Pre-installed Components on the Top Panel
Figure 18 identifies the pre-installed DIN rail bracket on the back panel.
One DIN rail bracket
(fixed to the device)
Figure 18. Pre-installed DIN Rail Bracket on the Back Panel
1
2
One M4x8 Phillips-head
grounding screw with
star washer
One 6-pin connector on the
DC power PWR 1, PWR 2 and
P-Fail connector

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Is seriesAt-is130-6gpIs230-10gpIs130-6gp

Table of Contents