Chapter 4: Installing the Chassis
88
Figure 40. Removing the Blank Power Supply Panel from Power Supply
3. Lift the handle on the AT-SBxPWRSYS2 AC Power Supply. Refer to
Figure 41.
Figure 41. Lifting the Locking Handle on the AT-SBxPWRSYS2 Power
4. Carefully align the power supply in the slot and slide it into the slot until
it makes contact with the connector inside the chassis. Refer to Figure
42 on page 89.
Slot B
Supply