Connect The Communication Cable Power Cabinet; Route The Cable To The Terminal Blocks; Connect The Communication Fiber Cables - ABB HVC-PD Installation Manual

Hide thumbs Also See for HVC-PD:
Table of Contents

Advertisement

5.9. Connect the communication cable Power Cabinet

The communication fiber cables to the ACS Control Module are only
connected within the primary HVC 150 Power Cabinet, see for more
details section Cabling on Page 49.

5.9.1. Route the cable to the terminal blocks

Preferred cable route
1.
Route the communication fiber cable to module D1 (B) and D2 (A). Refer to the figure for
the preferred cable route inside the cabinet (only within the HVC 150).

5.9.2. Connect the communication fiber cables

Preconditions:
Tools: tak-ty or ty-raps
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022
HVC‐PD E‐Bus Charger Installation Guide 
NOTICE
Page 85 of 146

Advertisement

Table of Contents
loading

Table of Contents