Environment And Disposal Of Waste; Cyber Security Disclaimer - ABB HVC-PD Installation Manual

Hide thumbs Also See for HVC-PD:
Table of Contents

Advertisement

Make sure that there is a minimum free space of 39.37 Inch in front of
the door of the ACS Control Module. The minimum space is necessary
to allow service personnel to quickly move away from the ACS Control
Module if there is an emergency when the door is open.
Warranty
Installation and commissioning work must be carried out by certified
personnel. The warranty will be void if any work carried out by non-
certified personnel.
Un-authorized modifications of hardware will void units warranty and
service support.

1.5. Environment and disposal of waste

Always observe the local rules and regulations with respect to processing
(non-reusable) parts of the HVC-PD E-Bus Charger.

1.6. Cyber Security Disclaimer

This product is designed to be connected to and to communicate information and data via a
network interface. It is customer's sole responsibility to provide and continuously ensure a
secure connection between the product and customer network or any other network (as the
case may be). Customer shall establish and maintain any appropriate measures (such as but
not limited to the installation of firewalls, application of authentication measures, encryption of
data, installation of anti-virus programs, etc) to protect the product, the network, its system
and the interface against any kind of security breaches, unauthorized access, interference,
intrusion, leakage and/or theft of data or information.
ABB Ltd and its affiliates are not liable for damages and/or losses related to such security
breaches, any unauthorized access, interference, intrusion, leakage and/or theft of data or
information.
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022
HVC‐PD E‐Bus Charger Installation Guide 
WARNING
CAUTION
CAUTION
Page 13 of 146

Advertisement

Table of Contents
loading

Table of Contents