3.
Installing the concrete base plate
Preconditions:
4x WLL 3/5.0 tons lifting claws (are not delivered by ABB, use for example Starcon Universal
Lifting Claws, art.no. 99.11590082B).
Make sure that personnel cannot be crushed or become trapped while
moving the foundation.
Before you lower the foundation, remove sharp edges of the cable holes
in the foundation to protect the cables.
The base plate has holes for entering cables into the charging pole construction which are
positioned aligned with the road. The base plate must be positioned in the right way to have
the cable conduits facing towards the foundation of the Power Cabinet. The base plate can be
installed 180 degrees to face the cable entries to the other side.
With preparation of the soil the concrete base plate can be installed. There are four bullet head
anchors (5 85 DH) pouring in the concrete base plate.
Hoist the base plate with using four lifting claws connected with four slings or chains with
sufficient capacity. The weight of the base plate is 7495.72 lb and the foot print is 94.49 x
94.49 Inch.
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022
HVC‐PD E‐Bus Charger Installation Guide 
WARNING
CAUTION
Page 46 of 146