Connect The Interlock Cable From The Power Cabinet - ABB HVC-PD Installation Manual

Hide thumbs Also See for HVC-PD:
Table of Contents

Advertisement

6.
Route the RFID Power cable (C) through gland #10 to connector block X4, with sufficient
cable length (do not make the cable routing too tight, or too loose).
7.
Tighten the nut of the gland to secure the RFID Power cable.
8.
Strip the insulation from the cable.
9.
Strip 0.43 Inch of the insulation from the ends of only the Brown and Blue wire!
10. Crimp a ferrule onto the end of the Brown and Blue wire.
11. Cut the other wires, except the Brown and Blue wire, at the end of the striped insulation
of the cable.
12. Loosen the connector screws.
13. Insert the wires into the correct connectors, see table below:
Functional description
24 V RFID
GND RFID
14. Tighten the connector screw with a tightening torque of 1.0 ft-lb.
5.16.12.

Connect the Interlock cable from the Power Cabinet

Preconditions:
Tools: wire cutter, wire stripper pliers, screwdriver, ferrules, crimp pliers.
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022
Connector
Wire color
X4-41
Brown
X4-42
Blue
HVC‐PD E‐Bus Charger Installation Guide 
Page 114 of 146

Advertisement

Table of Contents
loading

Table of Contents