1.
It is possible to choose to lubricate the bolts first or not with copper fat.
There are a number of reasons for using copper fat:
2.
Screw the M24 (or equivalent) nuts onto the bolts and place on each nut the 0.32 Inch
thick washers (16x). The default height between the top of the washer and foundation
must be 1.97 Inch.
3.
Carefully position the Charge Pole (B) above the foundation (A).
4.
Pull the cables through the opening (E).
5.
Lower the Charge Pole onto the foundation, aligned above the bolts (F).
6.
Check whether the Charge Post is properly aligned with the road or curb.
7.
Screw the first M24 nuts fitted with the washers on the bolts (16x, rotate slightly).
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022
It is corrosion resistant;
Less torque must be used on the nut to develop the same force on
the bolt.
Less friction damage to the M24-wire on the bolt and nut, leaving the
galvanized wire surface intact which promotes corrosion resistance.
Do not use the 0.12 Inch thick washers supplied with the foundation.
The nuts need to be leveled relative to the concrete foundation, else
you would compensate the sand settlement angle.
HVC‐PD E‐Bus Charger Installation Guide 
NOTICE
NOTICE
Page 91 of 146