5.5.3. Move the sliding plate of the guidance plates of the cabinet
Preconditions:
Tools: spanner (size 13).
1.
Loosen the bolts (A).
2.
Move the sliding plate (B) of the 2 guidance plates.
5.5.4. Route cables through guidance plates
1.
Route the cables (A) through the right guidance plates (B).
2.
Make sure that there is sufficient cable length to reach the connectors at the top of the
cabinet.
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022
HVC‐PD E‐Bus Charger Installation Guide
Page 63 of 146