CAN cable connection in primary HVC 150:
A
Terminal block
B
CAN cable from secondary 1 HVC 150S
1.
Move the cable towards the terminal block (A).
2.
Strip 0.43 Inch of the insulation from the ends of the wires.
3.
Crimp a ferrule onto the end of the wire.
4.
Loosen the connector screws.
5.
Insert the wires into the connectors, see table below:
Functional description
CAN H In
CAN L Out
CAN GND
See also Appendix H Signal connection diagram.
6.
Tighten the connector screws with a tightening torque of 1.0 ft-lb.
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022
Connector
X286-1
X286-2
X286-3 or Shield Can In
HVC‐PD E‐Bus Charger Installation Guide 
Wire color
Brown
White
Shield