ABB HVC-PD Installation Manual page 104

Hide thumbs Also See for HVC-PD:
Table of Contents

Advertisement

1.
Open the door (A) of the Charge Pole by unlocking the two lockers (B).
Steps 2 to 4 are only required when the lower front cover plate is delivered assembled onto
the pole. Normally the lower front cover plate (E) and both U-profiles (C) are delivered
separately with the pole.
2.
Remove on both side the U-profiles (C) by detaching the two M6 bolts (D).
3.
Remove the cover plate (E) by detaching the M6 bolts (F).
4.
Put the cover plate, U-profiles and bolts in a safe location as it will be installed again later
on.
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022
HVC‐PD E‐Bus Charger Installation Guide 
Page 104 of 146