4.2.4. Workflow mounting Power Cabinet direct on a floor (footprint)

1.
Drill and tap holes in the floor at the indicated positions (A). The holes must be suitable
for bolt size M16.
2.
Make rectangular holes on the indicated positions (B) and (C). For detail drawings bottom
view of Power Cabinet see Appendix A Dimensions Power Cabinet.
3.
Make sure that the AC power cable and other cables comes out of the floor within the
marked area (B).
4.
Make sure that the DC power cables come out of the floor within the marked areas (C).
5.
For the AC and DC power cable, make sure that a cable length of 3.28 ft is available
above the floor for internal routing in the cabinet.
6.
For the other cables, make sure that a cable length of 9.84 ft is available above the floor
for internal routing in the cabinet.
This extra cable length is required to connect the cables with the
connectors in the Power Cabinet without problems.
To prevent dust from entering the tapped holes, it is recommended that
you cover them until you are ready to do the placement.
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022
HVC‐PD E‐Bus Charger Installation Guide 
NOTICE
NOTICE
Page 43 of 146

Advertisement

Table of Contents
loading

Table of Contents