ABB HVC-PD Installation Manual page 83

Hide thumbs Also See for HVC-PD:
Table of Contents

Advertisement

CAN cable connection in secondary 1 HVC 150S:
A
Terminal block
B
CAN cable to primary HVC 150
C
CAN cable from secondary 2 HVC 150S (in case of a HVC 450 kW system)
1.
Move the cable towards the terminal block (A).
2.
Strip 0.43 Inch of the insulation from the ends of the wires.
3.
Crimp a ferrule onto the end of the wire.
4.
Loosen the connector screws.
5.
Insert the wires into the connectors, see table below:
Functional description
CAN H In (to primary HVC 150)
CAN L In (to primary HVC 150)
CAN GND (to primary HVC 150)
CAN H Out (from secondary 2 HVC 150S)
CAN L Out (from secondary 2 HVC 150S)
CAN GND (from secondary 2 HVC 150S)
See also Appendix H Signal connection diagram.
6.
Tighten the connector screws with a tightening torque of 1.0 ft-lb.
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022
HVC‐PD E‐Bus Charger Installation Guide 
Connector
X286-1
X286-2
X286-3 or Shield Can In
X286-16
X286-17
X286-18 or Shield Can Out
Wire color
Brown
White
Shield
Brown
White
Shield
Page 83 of 146