Power Cabinet - ABB HVC-PD Installation Manual

Hide thumbs Also See for HVC-PD:
Table of Contents

Advertisement

2.1.4. Power Cabinet

Outside view of the Power Cabinet
A
Base cover
B
Air outlet
C
Door
Inside view of the Power Cabinet
A
AC Fuses
B
AC Power connection
C
Guidance plate of the cables
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022
HVC‐PD E‐Bus Charger Installation Guide 
D
3G Antenna
E
Air inlets (also on the left and back side)
F
Door handle / lock
D
Data/communication connection
E
Display (only present in HVC 150)
Page 17 of 146

Advertisement

Table of Contents
loading

Table of Contents