Open The Door Of The Acs Control Module; Connect The Dc+ Power Input Cables - ABB HVC-PD Installation Manual

Hide thumbs Also See for HVC-PD:
Table of Contents

Advertisement

5.16.5.

Open the door of the ACS Control Module

Preconditions:
Key
1.
Unlock the locks (B).
2.
Open the door (A).
5.16.6.

Connect the DC+ power input cables

Preconditions:
Tools: wire cutter, wire stripper pliers, cable lugs (3x), spanner (size18), torque wrench
(size 18).
Ensure that the DC cables during mounting do not hit the PCBAs on the
door of the ACS Control Module. When these cables hit the PCBAs, the
PBCAs can be damaged. It is advised to protect the PCBAs during
mounting of the DC cables.
To prevent damage of the PCBAs in the ACS Control Module:
1.
Cut the DC cables at 15.75 Inch from the bottom side of the ACS Control Module.
2.
Open the door of the ACS Control Module and check the required length.
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022
HVC‐PD E‐Bus Charger Installation Guide 
NOTICE
Page 107 of 146

Advertisement

Table of Contents
loading

Table of Contents