ABB HVC-PD Installation Manual page 95

Hide thumbs Also See for HVC-PD:
Table of Contents

Advertisement

To make it easier to place the bottom corner cover plates (L), the hinge
plates on both sides of the columns of the Charge Pole can be removed.
This makes it possible that the cover plate (H) does not have to be
removed.
10. Place the top corner cover plates (K) (2x) onto the Charge Post, and tighten the M6 bolts
(J) (8x).
11. Place the bottom corner cover plates (L) (2x) onto the Charge Post, and tighten the M6
bolts (L) (8x).
12. Place the corner U-profiles (M) (4x) on both side of the Charge Post, and tighten the M6
bolts (8x).
13. Place the front cover plate (N) onto the end of the mast boom (B).
14. Use M10 x 30 THVZ bolts (P) (2x) in combination with a M10 THVZ washers (2x) to fix
the front cover plate (N).
15. Place the Front U-profile (O) onto the front cover plate (N).
16. Screw the Front U-profile (O) tight with M6 bolts (J) (2x).
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022
HVC‐PD E‐Bus Charger Installation Guide 
NOTICE
Page 95 of 146