ABB HVC-PD Installation Manual page 101

Hide thumbs Also See for HVC-PD:
Table of Contents

Advertisement

6.
Place the pantograph in the correct position, see also section Instruction for pantograph
adjustment and alignment on Page 97, by moving the pantograph over the C-profile (by
hand or with help of the present tensioning straps).
7.
Lock the pantograph by tighten the M12 bolts (D) (4x) of the clamping plates (E).
The tensioning straps must not be removed after the pantograph has
been adjusted. Eventual corrections can still be made during
commissioning. The tensioning straps are removed after commissioning.
8.
When removed, place back the cover plates (B) so that only the pantograph and the WiFi
antenna are free of access, and tighten the M6 bolts.
Additional cover plates are included in the supplied wooden crate. The
additional cover plates can be used to properly sealed the bottom side of
the horizontal frame of the Charge Pole,
placed in the correct position.
8. Place back the U-profiles (A) on both side, and tighten the M6 bolts.
Make sure there are no cover plates directly under the WiFi
communication unit. This can disrupt the communication with the bus or
possibly make it impossible.
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022
HVC‐PD E‐Bus Charger Installation Guide 
NOTICE
NOTICE
after the pantograph has been
NOTICE
Page 101 of 146

Advertisement

Table of Contents
loading

Table of Contents