Example of civil installation for a HVC 150 kW system
A
Foundations of Power Cabinet (for reference only)
B
Foundation of Charge pole (for reference only)
C
Flexible conduit for DC power cables
D
Flexible conduit for AC utility power, GND wire and data cables
E
AC power cables (required individually for each Power Cabinet)
Document the location of all the cables in the ground between the Power
Cabinet and the Charge control set. The routing of the cables can be
found easily in the future, for example, to prevent damage by excavation
work.

3.9. Lightning protection

One electrode (ground rod) of maximum 10 Ω must be placed into the earth near the pole
foundation. In some cases also additional grounding is required at the Power Cabinet side.
This requirement must be determined by the contractor and owner of the site / HVC-PD E-Bus
Charger.
The implementation of the lightning protection depends on the local laws,
safety and electrical regulations.
Follow the local, state and NEC code
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022