2.
Remove the bolts (D) and nuts (E) (2x) which secured the transport holder (A) with the
column (C) of the Charge Pole.
3.
Lift up the mast boom (B) until it touches the column (C) horizontally.
4.
Mount the mast boom (B) onto the column (C) by using 12x M16 bolt + washer / washer
+ nut connection. Use 12 pieces bolts of M16 x 60 (THVZ) Class 8.8, and THVZ washers
and nuts. A torque of 169.64 ft-lb has to be applied.