2.1.2. Standard HVC-PD 300 kW E-Bus Charger system

The following parts are provided for this system configuration:
HVC Panto Down 300 kW set of power cabinets:
 1x HVC Panto Down 150 kW primary power cabinet
1x HVC Panto Down 150 kW secondary power cabinet 1x fold-out HVC PD charge
pole set 150-450kW UL (ABB6AGC100126) or HVC PD charge pole set 150-450kW
UL BAA (ABB6AGC100125) including:
 1x ACS Control Module (ACM)
 1x Pantograph (ACS)
 1x Charge state indicator lights with light-sensor
 1x Emergency unit
 1x WiFi communication unit (for the bus)
 Pre-mounted cable set for inside the pole
 Transport and lifting tools

2.1.3. Standard HVC-PD 450 kW E-Bus Charger system

The following parts are provided for this system configuration:
1x HVC Panto Down 150 kW primary power cabinet
1x fold-out HVC PD charge pole set 150-450kW UL (ABB6AGC100126) or HVC PD
charge pole set 150-450kW UL BAA (ABB6AGC100125) including:
 1x ACS Control Module (ACM)
 1x Pantograph (ACS)
 1x Charge state indicator lights with light-sensor
 1x Emergency unit
 1x WiFi communication unit (for the bus)
 Pre-mounted cable set for inside the pole
 Transport and lifting tools
The cables between the Power Cabinet(s) and Charge Pole is not part of
the order. See section Cabling on Page 49 for selecting the right cable
type needed between the Power Cabinet(s) and Charge Pole.
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022
HVC‐PD E‐Bus Charger Installation Guide 
NOTICE
Page 16 of 146

Advertisement

Table of Contents
loading

Table of Contents