ABB HVC-PD Installation Manual page 96

Hide thumbs Also See for HVC-PD:
Table of Contents

Advertisement

HVC‐PD E‐Bus Charger Installation Guide 
17. Place back the cover plate (H) and tighten the M6 bolts (J) (4x).
18. Place back the U-profiles (I) on both side, and tighten the M6 bolts (J) (4x).
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022
Page 96 of 146

Advertisement

Table of Contents
loading

Table of Contents