ABB HVC-PD Installation Manual page 81

Hide thumbs Also See for HVC-PD:
Table of Contents

Advertisement

8.
Tighten the connector screws with a tightening torque of 1.0 ft-lb.
Interlock cable connection in secondary 2 HVC 150S:
A
Terminal block
B
Interlock cable from/to secondary 1 HVC 150S
1.
Move the cables towards the terminal block (A).
2.
Strip 0.43 Inch of the insulation from the ends of only the White and Brown wire!
3.
Crimp a ferrule onto the end of the White and Brown wire.
4.
Ensure that the unused wires, the Green and Yellow wire, are protected so that they
cannot touch metal parts.
5.
Make a wire connection between pin X286-7 and X286-8.
6.
Loosen the connector screws.
7.
Insert the wires into the connectors, see table below:
Functional description
Interlock In (secondary 1 HVC 150S)
Interlock Out (secondary 1 HVC 150S)
Interlock GND (secondary 1 HVC 150S)
Interlock loop
Interlock loop
See also Appendix H Signal connection diagram.
8.
Tighten the connector screws with a tightening torque of 1.3 N∙m.
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022
HVC‐PD E‐Bus Charger Installation Guide 
Connector
Wire number
X286-4
Brown
X286-6
White
X286-5
Shield
X286-7
Black
X286-8
Black
Page 81 of 146

Advertisement

Table of Contents
loading

Table of Contents