3. Preparation

3.1. About preparation

The planning steps for the preparation phase are shown in the figure below:
A1
Ordering
Order the HVC-PD E-Bus Charger.
A2
Engineering
The owner / site operator selects a contractor to do the civil and electrical installation
work. The contractor is responsible for all construction documentation of the site,
among other things: drawings, calculations, certifications, licenses and test reports.
The location of the HVC-PD E-Bus Charger must be chosen. See section Location on
Page 27 and section Geometry of infrastructure on Page 28.
A3
Get permits
Take care of all permits and local regulations. See section Permits on Page 26.
A4
Upgrade grid
If required, upgrade the electrical grid connection to 3-phase 480/277 V AC or 600/347
V AC. See section Upgrade grid on Page 27.