Connect The Can Cable - ABB HVC-PD Installation Manual

Hide thumbs Also See for HVC-PD:
Table of Contents

Advertisement

5.8.6. Connect the CAN cable

The CAN cable connection is only needed for the HVC 300 kW and 450
kW E-Bus Charger, see for more details section Cabling on Page 49.
CAN cable connection in secondary 2 HVC 150S (in case of a HVC 450 kW system):
A
Terminal block
B
CAN cable to secondary 1 HVC 150S
1.
Move the cable towards the terminal block (A).
2.
Strip 0.43 of the insulation from the ends of the wires.
3.
Crimp a ferrule onto the end of the wire.
4.
Loosen the connector screws.
5.
Insert the wires into the connectors, see table below:
Functional description
CAN H Out
CAN L Out
CAN GND
See also Appendix H Signal connection diagram.
6.
Tighten the connector screws with a tightening torque of 1.0 ft-lb.
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022
NOTICE
Connector
X286-10
X286-11
X286-12 or Shield Can Out
HVC‐PD E‐Bus Charger Installation Guide 
Wire color
Brown
White
Shield
Page 82 of 146

Advertisement

Table of Contents
loading

Table of Contents