Labrie EXPERT Maintenance Manual page 94

Table of Contents

Advertisement

84 General Maintenance
N
: If a tipper is installed on the side panel, you will have first to remove it before removing the side
OTE
panel.
2.
Remove the lower part of both side rails (one on each side of the hopper) by using a 5/16-inch
Allen wrench and a 3/4-inch wrench (see Figure 3-194).
There are 6 bolts in total on each side.
N
: In order to get access to the last of the 6 bolts that hold the lower part of the side rail in place,
OTE
remove the midway flashing lights located on each side of the truck.
Figure 3-94
Flashing light removed
3.
Remove all packer roller assemblies from the follower panels (See Rollers on page 190).
4.
Fold the follower panels over the packer.
5.
Weld the follower panels to the packer.
6.
Attach the packer to a lifting device (fork lift, etc.) and lift it out of the hopper.
Warning!
Use an appropriate lifting device to lift the packer out of the hopper. Failure to do so may
result in serious injury or death or damage to the equipment.
NEXT: INSTALLING NEW PACKER: See "B. Installing New Packer - Standard Units W/O
Loading Arm" on page 90.
C. Removing Packer Panel - Co-Mingle Units W/ Loading Arm
Once the packer has been prepared, accessed and disconnected, you can remove it from the hopper.
To do so:
1.
Remove the arm stopper.
Before removing it, make sure you mark down the arm stopper location with a pen.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents