Labrie EXPERT Maintenance Manual page 47

Table of Contents

Advertisement

13.
Finish cleaning the area with pressurized water.
14.
Perform a visual inspection of the area behind the packer through the clean-out traps. Check for
possible leaks in the hydraulic system and wear signs on mechanical parts such as: rollers,
cylinder pins, hoses, pipes,, connections, and hopper floor and sidewalls. Also check cylinders
and hoses for leaks as well as bolts for proper tightness.
15.
Climb inside the hopper using a small step-ladder.
16.
Fully open both floating panels (see Figure 3-12).
To open panel just pull down the sliding button next to the handle and keep it down while pulling
the panel towards you. Tilt it until completely open (see Figure 3-13).
Figure 3-12
Floating panels
Figure 3-13
Floating panel completely open
17.
Remove all accumulated dirt on the follower panels using the provided hoe or pressurized water.
18.
Once cleaning is complete, close both floating panels.
General Maintenance 37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents