Mounting An Automation Panel 1000 With Clamping Blocks - B&R Panel PC 2100 User Manual

Hide thumbs Also See for Panel PC 2100:
Table of Contents

Advertisement

Commissioning

3.1.4 Mounting an Automation Panel 1000 with clamping blocks

The Panel PC 2100 with AP1000 panel is installed in the cutout using clamping blocks. The number of clamping
blocks depends on the panel.
The following Automation Panel 1000 panels are mounted using clamping blocks:
• 5AP1181.1043-000
• 5AP1182.1043-000
• 5AP1120.1214-000
• 5AP1120.1505-000
• 5AP1180.1505-000
• 5AP1181.1505-000
• 5AP1120.1906-000
The thickness of the wall or control cabinet plate must be at least 2 mm and is not permitted to exceed 10 mm.
A 3 mm hex socket screwdriver is needed to tighten and remove the screw on the clamping block. The maximum
tightening torque for the screw is 0.5 Nm.
Devices must be installed on a flat, clean and burr-free surface; tightening screws on an uneven area can result
in damage to the display or the ingress of dust and water.
Procedure
1. Insert the device into the front of the prepared, burr-free and flat installation cutout. For the dimensions of the
cutout, see
Tab. 14 "AP1000 panels with clamping blocks - Installation diagrams" on page
of clamping blocks may vary depending on the panel. For the exact number, see
with clamping blocks - Installation diagrams" on page
216
Figure 118: Position of the clamping blocks (sample figure)
28.
28. The number
Tab. 14 "AP1000 panels
Panel PC 2100 user's manual V1.17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mappc2100-eng

Table of Contents