KYMCO UXV 500i Service Manual page 352

Hide thumbs Also See for UXV 500i:
Table of Contents

Advertisement

17
. BATTERY/CHARGING SYSTEM
INSTALLATION
Install the stator and tighten the stator mount
bolts to the specified torque.
Torque: 1.2 kgf-m (12 N-m, 9 lbf-ft)
Apply sealant to the grommet seating surface
and install it to the cover groove properly.
Install the pulse coil and tighten mount bolts
to the specified torque.
Torque: 1.2 kgf-m (12 N-m, 9 lbf-ft)
Clean the mating surfaces of the right
crankcase and cover.
Install the dowel pins and gasket.
Install the right crankcase cover and tighten
the bolts in a crisscross pattern in 2 or 3 steps.
FLYWHEEL:
Refer to the "STARTER CLUTCH
REMOVAL/INSPECTION/INSTALL
ATION" section in the chapter 19
17-13
Stator
Grommet
Gasket
Right Crankcase Cover
UXV 500
Pulse
Dowel Pins

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uaa0

Table of Contents