8. CYLINDER HEAD/VALVES
Apply engine oil to cylinder head bolt (No.
1 – 8) threads.
Install the four bolts (No. 5 – 8).
Install the four bolts/washers (No. 1 – 4).
Tighten the holder bolts (No. 1 – 8) in a
crisscross pattern in five steps to the specified
torque as follow diagram.
2.4 (24, 17)
Step 1
3.8 (38, 27)
Step 2
4.8 (48, 35)
Step 3
8-13
Tighten the bolts to the specified torque in sequence
(1)
(2)
(3)
←
←
←
←
←
←
kgf-m (N-m, lbf-ft)
(4)
(5)
1.2 (12, 9)
←
2.3 (23, 17)
←
←
NOTE: Install the camshafts. a point for
attention.
Confirm the camshaft turned smoothly.
Check while camshafts are at the engine compression
TDC poisition and have clearance for free play of both
rotation and axial directions.
UXV 500
(6)
(7)
(8)
←
←
←
←
←
←