Installation - KYMCO UXV 500i Service Manual

Hide thumbs Also See for UXV 500i:
Table of Contents

Advertisement

14.
FRONT WHEEL/FRONT SUSPENSION/
STEERING SYSTEM

INSTALLATION

Install the wheel hub, washer and nut.
Apply grease onto the wheel hub splines.
Apply the front brake and then tighten the
nut to the specified torque.
Torque: 20 kgf-m (200 N-m, 145 lbf-ft)
Install the cotter pin and band ends of cotter
pin.
● Do not apply oil to the seat of the nut.
● Do not loosen the wheel hub nut after
torque tightening. If the wheel hub nut
groove is not aligned with the cotter
pin hole, align groove with the hole by
tightening up on the wheel hub nut.
Always use a new cotter pin.
Nut/Washer
Cotter Pin
UXV 500
14-6

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uaa0

Table of Contents