6
. COOLING SYSTEM
UXV 500
INSTALLATION
Install the gasket and oil cooler.
Install the washers and tighten the oil cooler
bolts to the specified torque.
Torque:35N.m(3.5kgf.m,25lbf.ft)
Connect the oil cooler water hoses, tighten
The hose band securely.
Install the oil filter cartridge and fill the
crankcase with recommended engine oil.
Fill the cooling and bleed air .
Water Hose
Oil Hose
6-20