13
. DRIVE TRAIN
INSTALLATION
Install the front drive case into the frame.
Install and tighten the two mounting
bolts/nuts to the specified torque.
Torque: 4 kgf-m (40 N-m, 29 lbf-ft)
Install the front propeller shaft.
Connect all wire connectors and then install.
13-13
UXU 500
Front Propeller Shaft