9. CYLINDER/PISTON
Apply engine oil to the cylinder wall, piston
and piston ring outer surfaces.
Pass the cam chain through the cylinder and
install the cylinder over the piston.
*
Be careful not to damage the piston rings
and cylinder walls.
Install the two cylinder bolts/washers and
after the cylinder head and holders has
installed (refer to the "CYLINDER HEAD
REMOVAL/INSTALLATION" section in
the chapter 8), then tighten the two cylinder
bolts to specified torque.
Torque: 10 N•m (1 kgf•m, 7 lbf•ft)
Install the block pin.
Connect the water hose.
9-9
Cam Chain
Cylinder
UXV 500
Block Pin
Water Hose