Lcd Display Frame Replacement Procedure; Lcd Display Frame Removal Procedure; Removing The Screw Caps From The Lcd Display Frame; Removing The Securing Screws - GE Vivid i n Service Manual

Hide thumbs Also See for Vivid i n:
Table of Contents

Advertisement

GE H
EALTHCARE
D
FL091021, R
IRECTION
8-2-7

LCD Display Frame Replacement Procedure

8-2-7-1
Tools
Use the appropriate Phillips and flat screw drivers, as indicated in the bottom assembly replacement
procedures.
8-2-7-2
Time Required
10 minutes
8-2-7-3
Preparations
Shut down the Vivid i n ultrasound unit, as described in
8-2-7-4

LCD Display Frame Removal Procedure

1) With the LCD Display in the open (upright) position, use a flat screwdriver to remove the screw cap
from each of the four screws that fasten the LCD display frame in position, as shown in
below.
Figure 8-19 Removing the Screw Caps from the LCD Display Frame
2) Loosen and remove the four screws
8-22
5
EVISION
Figure 8-20 Removing the Securing Screws
Section 8-2 - External Component Replacement Procedures
Chapter
(Figure
8-20).
V
S
IVID I N
ERVICE
3-
System
Setup.
M
ANUAL
Figure 8-19

Advertisement

Table of Contents
loading

This manual is also suitable for:

H45561acH45551deFl000110Fl000090

Table of Contents