GE H
EALTHCARE
D
FL091021, R
IRECTION
8-3-4-5
HVPS Installation Procedure
1) Return the HVPS to its original position - refer to
2) Return the five screws and fasten the HVPS in position on the Bottom Assembly, as shown in Figure
8-37 on page 8-39 .
3) Reconnect each of the two Power Supply cables to the DC Power Supply (HVPS-to-BEP and
HVPS-to-RFI), as shown in Figure 8-36 on page 8-38 .
4) Make sure the Vivid i n LCD Display cover is securely closed and place the scanner face down. Re-
install the battery as described in the
5.) Proceed to perform the following functionality tests:
-
-
-
8-40
5
EVISION
"Chassis Current Leakage Test" on page 10-25
"Calibration Tests" on page 7-15
"Full System Test" on page 7-9
Section 8-3 - Internal Component Replacement Procedures
Figure
8-38, above.
"Battery Installation Procedure" on page
V
S
M
IVID I N
ERVICE
ANUAL
8-3.