GE H
EALTHCARE
D
FL091021, R
IRECTION
Section 4-4
System Turnover Checklist
Before returning the Vivid i n ultrasound scanner to regular operational use, the System Configuration
settings should be checked. In 2D-Mode, press Config on the keyboard and check the settings in
accordance with those listed or referenced in
4-4-1
Software Configuration Checks
Table 4-18
Step
1
2
3
4
5
6
7
4-28
5
EVISION
Software Configuration Checklist
Check the date and time settings. Refer to "Date and Time Adjustments" on page 3-49.
Check the language settings.Refer to "Language Selection" on page 3-50.
Ensure that all of the software options are configured correctly. Refer to "Software Options
Configuration" on page 3-61.
Ensure that the hospital details are configured correctly. Refer to
Ensure that the VCR is configured as required for the specific site and country. Refer to video converter
setup - see Figure 3-20 on page 3-33 .
Ensure that the measurement units are configured as required for the specific site and country.Refer
to "Units of Measure" on page 3-51.
Ensure that the connectivity network settings have not been modified and are configured as required
for the specific site. Refer to "Set the Scanner's Network Information" on page 3-71.
Section 4-4 - System Turnover Checklist
Table 4-18
below.
Task
Table 3-13 on page
V
S
M
IVID I N
ERVICE
ANUAL
Check
3-48.