Fuses - Installation Procedure - GE Vivid i n Service Manual

Hide thumbs Also See for Vivid i n:
Table of Contents

Advertisement

GE H
EALTHCARE
D
FL091021, R
IRECTION
8-7-3-5

Fuses - Installation Procedure

1.) Insert 2 new Fuses.
2.) Push the fuse holder back into position (correct voltage should be shown in upper line e.g, 230V,
see:
3.) Reconnect the mains power cable.
4.) Switch on the system, refer:
5.) Do a System Test, refer:
6.) Switch off the system, refer:
8-104
5
EVISION
Figure
8-82, above) and then close protection.
"Full System Test" on page 7-9
Section 8-7 - Modo Cart Components Replacement
"Power ON/Boot-up" on page 4-3.
"Power Shut Down" on page 4-7
V
S
M
IVID I N
ERVICE
ANUAL

Advertisement

Table of Contents
loading

This manual is also suitable for:

H45561acH45551deFl000110Fl000090

Table of Contents