Huawei NetEngine40E Hardware Description page 260

Hide thumbs Also See for NetEngine40E:
Table of Contents

Advertisement

HUAWEI NetEngine40E Universal ServiceRouter
Hardware Description
Figure 6-44 Appearance of the 1-Port 100GBase-CFP Integrated Line Processing Unit
(LPUI-101)
Panel
Figure 6-45
(LPUI-101).
Figure 6-45 1-Port 100GBase-CFP Integrated Line Processing Unit (LPUI-101) panel
Table 6-114
Processing Unit (LPUI-101) panel.
Table 6-114 Description of the buttons and indicators on the 1-Port 100GBase-CFP Integrated
Line Processing Unit (LPUI-101) panel
Indicator/Butto
n
OFL button
OFL indicator
(red)
RUN (green)
LINK/ACT
(green)
Issue 01 (2012-09-30)
shows the panel of the 1-Port 100GBase-CFP Integrated Line Processing Unit
describes the buttons and indicators on the 1-Port 100GBase-CFP Integrated Line
Description
It is an OFL button. Before removing a board, press the OFL button.
Hold the button for six seconds till the OFL indicator is on. Then, the
board can be pulled out.
If the indicator is steady on, it indicates that you can remove the
board.
If the indicator blinks once every 2s (0.5 Hz), it indicates that the
system is running normally. Otherwise, it indicates that the board fails
to run normally.
If the indicator is steady on, it indicates that the link is normal. If the
indicator blinks, it indicates that data is being transmitted. If the
indicator is off, it indicates that the link is Down.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 Boards
246

Advertisement

Table of Contents
loading

This manual is also suitable for:

V600r006c00

Table of Contents