Replace The Instrument Fuses; Materials Required; Replace The Fuses - Thermo Scientific Applied Biosystems QuantStudio 6 Pro User Manual

Real-time pcr system
Table of Contents

Advertisement

• Clean the sample block with 95% ethanol.
a. Pipet a small volume of 95% ethanol solution into each contaminated well.
b. In each well, pipet the solution up and down several times to rinse the well.
c. Pipet the ethanol solution to a waste beaker.
IMPORTANT! Always use deionized water to rinse wells after cleaning with bleach or ethanol
solution.
• Clean the sample block with 10% bleach.
a. Pipet a small volume of 10% bleach solution into each contaminated well.
b. In each well, pipet the solution up and down several times to rinse the well.
c. Pipet the bleach solution to a waste beaker.
IMPORTANT! Always use deionized water to rinse wells after cleaning with bleach or ethanol
solution.

Replace the instrument fuses

CAUTION! FIRE HAZARD. For continued protection against the risk of fire, replace fuses only with
listed and certified fuses of the same type and rating as those currently in the instrument.

Materials required

• Fuses (2) – 10A, Time-Lag T, 250VAC, 5 × 20 mm
• Safety glasses
• Powder-free gloves
• Screwdriver, flathead

Replace the fuses

1. Power off, then unplug the instrument.
2. Allow the instrument cool for 15 minutes.
QuantStudio
6 Pro Real-Time PCR System and QuantStudio
Chapter 10 Maintain the instrument
7 Pro Real-Time PCR System User Guide
Replace the instrument fuses
10
161

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Applied Biosystems QuantStudio 6 Pro and is the answer not in the manual?

This manual is also suitable for:

Applied biosystems quantstudio 7 pro

Table of Contents