Replace The Instrument Fuses; Materials Required; Replace The Fuses - Thermo Scientific Applied Biosystems QuantStudio User Manual

3d digital pcr system
Table of Contents

Advertisement

Appendix C Maintenance
C

Replace the instrument fuses

Replace the instrument fuses

Materials
required

Replace the fuses

90
5. Pack the instrument in the provided packaging, without any accessories or
power cords. Include a hard copy of the Certificate of Instrument
Decontamination in the box.
Note: Repairs for instruments without the Certificate of Instrument
Decontamination are delayed.
6. Affix the provided postage to the box, then ship the instrument to the
designated facility.
The repair process requires 2 to 3 weeks.
If the fuses of your QuantStudio
following procedure to replace them.
• Fuses, 1.6A, Time-Lag T, 250VAC, 5 × 20-mm (2)
• Safety glasses
• Powder-free gloves
• Screwdriver, flathead
CAUTION! FIRE HAZARD. For continued protection against the risk of fire, replace
fuses only with listed and certified fuses of the same type and rating as those
currently in the QuantStudio
1. Power off, then unplug the QuantStudio
2. Using a flat-head screwdriver, pry open the fuse door, and remove the fuse
holder.
3D Digital PCR Instrument fail, perform the
3D Digital PCR Instrument.
3D Digital PCR Instrument.
QuantStudio
3D Digital PCR System User Guide

Advertisement

Table of Contents
loading

Table of Contents