8.3.5

Setting the sampling times

Terminology
The software functions installed in the system are executed cyclically at different sampling
times (p0115, p0799, p4099).
Safety functions are executed within the monitoring clock cycle (p9300/p9500) and TM54F is
executed within the sampling time (p10000).
Communication on PROFIBUS is handled cyclically by means of the communication clock
cycle.
During the PROFIsafe scan cycle, the PROFIsafe telegrams issued by the master are
evaluated.
Rules
● The monitoring clock cycle (p9300/p9500) can be set between 500 μs to 25 ms.
● PROFIBUS
● The sampling time of the TM54F must be the same as the monitoring clock cycle (p10000
Safety Integrated
Function Manual, 05/2010, A5E03264275A
Note
The monitoring clock cycle must be the same on all drives.
However, the calculation time required for the Extended Functions in the Control Unit
depends on the monitoring clock cycle, that is, shorter clock cycles extend the calculation
time. The availability of a specific monitoring clock cycle therefore depends on calculation
time resources of the Control Unit.
Calculation time resources on the Control Unit are influenced primarily by the number of
drives, the number of drives with enabled Extended Functions, the connected DRIVE-
CLiQ components, the selected DRIVE-CLiQ topology, the use of a CBE20 and by the
selected technological functions.
– The monitoring clock cycle (p9300/p9500) must be an integer multiple of the actual
value update clock cycle. p9311/p9511 are generally used for the clock cycle for
actual value acquisition. If p9311/p9511 = 0 in
PROFIBUS communication clock cycle is used, in
actual update clock cycle in this case is 1 ms.
– The current controller cycle must be no more than a quarter of the length of the actual
value update clock cycle.
– The sampling time of the current controller (p0115[0]) must be at least 125 µs.
= p9300/p9500).
8.3 Commissioning of Safety Integrated functions
isochronous operation
non-isochronous
Commissioning
the isochronous
operation the
193

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinamics g150Sinamics s120 chassisSinamics s120 cabinet modulesSinamics s150

Table of Contents