Siemens SINAMICS G130 Manual page 235

Safety integrated
Hide thumbs Also See for SINAMICS G130:
Table of Contents

Advertisement

7. The safety configuration screen of the drive opens.
Figure 8-36
Safety configuration: Drive
8. For the drive, set the same Monitoring clock cycle (safety clock cycle) as for the TM54F
9. Set the required Drive type (linear axis / rotary axis) (p9502). Continue at item 15 if you
10. Close the screen. Click on the Copy parameters and then click on Activate settings (exit
11. Execute the "Copy RAM to ROM" function for the Entire project by clicking the "Entire
12. Perform a POWER ON. The new parameterization is now active.
13. Reconnect STARTER to the target device. The messages that are displayed indicate that
14. Load the project into the PD. The display of parameter units (rotary/linear axis) will be
15. Complete the configuration by adapting the parameterization of the required monitoring
Safety Integrated
Function Manual, 05/2010, A5E03264275A
(see "TM54F Configuration").
have not changed the selected drive type.
commissioning mode, p0010=0).
project" button.
safety commissioning was not completed (different actual and target checksum) can be
ignored.
updated accordingly in STARTER.
limits, timers, encoder settings, etc.
8.9 Commissioning a linear/rotary axis
Commissioning
235

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinamics g150Sinamics s120 chassisSinamics s120 cabinet modulesSinamics s150

Table of Contents