Acceptance test and acceptance report
10.5 Acceptance tests
10.5
Acceptance tests
Note
As far as possible, the acceptance tests are to be carried out at the maximum possible
machine speed and acceleration rates to determine the maximum braking distances and
braking times that can be expected.
Note
If Basic Functions and Extended Functions are combined, the acceptance test for both types
must be carried out for the functions used.
Note
The trace recordings for the Extended Functions aid evaluation of the more complex
functionality compared to the Basic Functions (for which trace recording is not required). If
necessary you can also use other recording possibilities.
Note
Non-critical alarms
When evaluating the alarm buffer you can tolerate the following alarms:
• A01697 SI Motion: Motion monitoring test required
• A01796 SI Motion CU: Waiting for communication
These alarms occur after every system startup and can be evaluated as non-critical. You do
not need to include these alarms in the acceptance report.
264
Safety Integrated
Function Manual, 05/2010, A5E03264275A