Assembling procedure
Motor
side
1. Strip the specified length (see below) of the outer sheath at the end of the cable.
4 x 2.5 mm
all other power cables: 135 mm
2. Cut off the exposed braided shield in its entirety.
3. Strip the inner sheath without damage to the insulation of each cable conductor.
4. Pass white cable marker tubes through corresponding cable conductors.
5. Strip 10 mm of the insulation at the end of each cable conductor.
6. Insert cable wires into individual conductor terminals. Use a crimping tool to crimp the terminals (minimum
tensile strength: 350 N).
7. (This step is necessary only for 4 x 10 mm
mm
/4 x 4 mm
2
completely cover the bending area of the terminal. Heat the tube until it shrinks to wrap tightly around the
terminal.
8. Pass all cable conductors through a heat-shrinkable tube. Heat the tube until it shrinks to wrap tightly
around the cable.
Commissioning Manual
6FC5397-4EP10-0BA8, 07/2018
power cable: 125 mm
2
power cables.) Pass each conductor terminal through a heat-shrinkable tube, which must
2
/4 x 16 mm
power cables. Skip this step if you assemble 4 x 2.5
2
2