31.
Connect the clutch cable to the crankcase and clutch (see Clutch Cable -
Installation).
32.
Ensure the mating surfaces on the inlet manifold and the cylinder head are clean.
33.
Fit two new seals to the mating surfaces of the inlet manifold.
34.
Fit the inlet manifold to the cylinder head.
35.
Tighten the inlet manifold to cylinder head fixings to 9 Nm in the sequence shown
below.
36.
Retighten the fixings one and two to 9 Nm.
37.
Ensure the throttle body hose is correctly fitted and tighten the clip to 1.5 Nm.
38.
Connect the MAP hose and the evaporative emissions hose to the inlet manifold,
as noted for removal.
39.
Fit the mountings for the air intake finisher and tighten its fixings to 3 Nm.
Service Manual - Scrambler 1200 XC
L0810
1
3
ckgn
Tightening Sequence
4
2
1
370 of 640