Day Scheduler; Calendar (Exception And Fixed Off) - Siemens Climatix Series Basis Document

Hide thumbs Also See for Climatix Series:
Table of Contents

Advertisement

Parameter
Period:Start
Period:Stop
Parameter
Parameter
Day Schedule
Time 1
Value 1
Time 2
Value 2 ... Value 6
Time 3 ... Time 6
Calendar exception
Calender fix off
Siemens
Building Technologies
Range
8.3

Day scheduler

Range
− Passive
− Active
8.4

Calendar (exception and fixed off)

Exception days are defined in the calendars. These may include certain days, peri-
ods or days of the week. On the exception days, the exception days override the
weekly schedule.
The plant switches per the weekly scheduler under the exceptions set in the daily
schedule when an entry is enabled in the calendar exception.
The plant switches off when the entry calendar fix Off is enabled.
Basis Document Siemens Climatix Control System
Standard application AHU
BDCX.100820.01GB
Detail pages: Time switch program
Function
(Only available at access level 2).
Start date for the weekly schedule.
The entry *,* *.00 means that the weekly sched-
ule is always enabled. ---> Enable weekly
schedule.
(Only available at access level 2).
Start date and time for when the weekly sched-
ule no longer applies.
Function
Status of week or exception day in question:
− Present week day (system day) does not cor-
respond to the processed day.
− Present week day (system day) corresponds
to the processed day.
Special case: This entry may not be adjusted; it
must always be set to 00:00 and requires pass-
word level 4 to change.
Switching command for Time 1.
Switching time 2.
*: * ---> Entry disabled.
Analog value 1.
Analog time 2.
115 / 244
CE1P3977en_02
Page 115
01.02.2010

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Oem seriesPol955Pol638 series

Table of Contents